A step-by-step process for obtaining DEWA Approvals: Tips and tricks.

DEWA LOGO

A step-by-step process for obtaining DEWA Approvals: Tips and tricks.

Are you ready to unlock the secrets of getting DEWA approvals effortlessly? Look no further! In this blog post, we will take you on a journey through the step-by-step process of obtaining those coveted DEWA approvals. From insider tips to tried-and-true tricks, we’ve got you covered. Whether you’re a seasoned professional or a newcomer in need of guidance, our comprehensive guide will empower and inspire you to breeze through the approval process like a pro. So, fasten your seatbelts and get ready for an adventure that will make acquiring DEWA approvals feel like a walk in the park!

Introduction to DEWA Approvals

DEWA is the regulatory authority for the power and water sector in the Emirate of Dubai. They are responsible for approving all new construction projects in Dubai. The approval process can be a bit daunting, but if you follow these steps, you will be well on your way to getting your DEWA approval.

  1. The first step is to submit a Letter of Intent (LOI) to DEWA. This letter must be submitted on the company’s official letterhead and must include the following information:

-The name of the project

-The location of the project

-The type of development (e.g., residential, commercial, etc.)

-An estimated start date for construction

-An estimated completion date for construction

  1. Once your LOI has been reviewed and approved by DEWA, you will need to submit a Project Proposal Form. This form can be obtained from DEWA’s website.
  2. The next step is to submit a Site Plan Approximation to DEWA. This should include a detailed layout of the proposed development, including the location of all buildings, landscaping, parking areas, etc.
  3. Once your Site Plan Approximation has been approved, you will need to submit a Detailed Site Plan to DEWA. This should include all the same information as the Site Plan Approximation, but with more detailed dimensions and markings.
  4. After your Det ailed Site Plan has been reviewed and approved, you will need to submit a Technical Drawing for the proposed development. This should include a detailed schematic of all electrical, plumbing, air conditioning, and other systems that are to be installed in your project.
  5. Once your Technical Drawing has been approved by DEWA, you will then need to submit a Building Permit Application Form. This form can also be obtained from DEWA’s website.
  6. After your Building Permit Application Form has been reviewed and approved by DEWA, you will then need to submit an Engineer’s Conformance Report. This document should include a detailed review of all building codes and regulations that must be followed for your project to be legally compliant in Dubai.
  7. Finally, you will need to submit an occupancy Certificate before anyone can move into the development once it is completed. This certificate can only be issued once the building has passed all inspections and is deemed safe by DEWA inspectors.

Step-by-Step Process for Obtaining DEWA Approvals

The Dubai Electricity and Water Authority (DEWA) is the government body responsible for providing utility services in the Emirate of Dubai. To ensure that all new developments in Dubai are designed and built in compliance with DEWA regulations, developers must obtain approval from DEWA for their projects.

The process for obtaining DEWA approval can seem daunting, but we’ve broken it down into a few simple steps to make it easy to understand:

  1. The first step is to submit a pre-approval application to DEWA. This application can be done online through the DEWA website.
  2. Once your pre-approval application has been submitted, a DEWA representative will contact you to schedule an appointment for a site visit.
  3. During the site visit, the DEWA representative will assess your project and determine whether it meets all DEWA requirements.
  4. If your project meets all DEWA requirements, you will be issued a final approval letter which you can then use to proceed with your development plans.

– Gather Necessary Documents

The process of obtaining DEWA approvals can seem complicated and daunting, but it doesn’t have to be. By following these simple tips and tricks, you can make the process quick and easy.

One of the first things you’ll need to do is gather all of the necessary documents. This includes your passport, visa, Emirates ID, and any other required documents. Make sure you have everything ready before starting the application process.

If you’re not sure what documents you need, DEWA has a handy checklist that you can use. Once you have everything gathered, you’re ready to start the application process!

– Sign Contracts with the Government Entity

To obtain DEWA approval for your project, you will need to sign a contract with the government entity. This contract will outline the terms and conditions of your project, as well as the approval process.

It is important to read and understand the contract before signing it. Once you have signed the contract, you will be required to submit all required documentation to DEWA.

DEWA will review your documentation and may issue an approval letter, which is required before work can begin on your project.

– Submit Application for Approval

To apply for approval from DEWA, you will need to submit the following documents:

  1. Application form
  2. Site plan
  3. Plot plan
  4. Proposal plan
  5. villa typology
  6. Property title deed (if applicable)
  7. No Objection Certificate (NOC) from developer (if applicable)
  8. Jordan Emirates Bank guarantee (if applicable).

The application forms are available on the DEWA website and can be completed online or downloaded and submitted in person or by post. If you are submitting the forms in person, you will need to provide copies of your passport, Emirates ID, and visa (if applicable). The site plan should show the location of your property in relation to surrounding properties and roads, while the plot plan should show the boundaries of your property and any features such as buildings, swimming pools, gardens, etc.

The proposal plan should include details of your proposed development, including floor plans, elevations, and a cross-section. The villa typology is a standard form that must be completed for all properties villas in Dubai. It asks for basic information about the property such as the number of bedrooms, bathrooms, etc. The property title deed is required if you are the owner of the property; if you are renting, you will need to provide a copy of your tenancy contract instead.

The NOC from your developer is only required if your property is in a development-controlled area; otherwise, it can be omitted. The same applies to the Jordan Emirates Bank guarantee, which you may need to provide if your property is in a development that requires one. Once you have all the required documents and forms ready, they can be submitted to DEWA either in person at one of their customer service centers or online via their website.

– Receive Feedback and Make Necessary Changes

After you have submitted your documents and received feedback from DEWA, it is important to make any necessary changes to ensure that your application is approved. Although it can be tempting to try to save time by making small changes yourself, it is always best to hire a professional who is familiar with the approval process and can help you make the necessary changes quickly and efficiently.

– Follow up on Status of the Application

If you have already submitted your application and are waiting for a response from DEWA, it is important to follow up on the status of your application to ensure that it is being processed in a timely manner. There are a few ways to do this:

Check the status of your application online:

DEWA offers an online system where you can check the status of your application. Simply log in with your application number and email address, and you will be able to see whether your application has been received and is being processed.

Call DEWA customer service:

If you would prefer to speak to someone directly, you can call DEWA customer service at 800-DEWA (3392). Customer service representatives will be able to tell you the status of your application and answer any questions you may have.

Visit DEWA in person:

If you would like to meet with someone in person, you can visit DEWA’s head office at Dubai World Trade Centre. Please note that an appointment is required for all visits, so make sure to schedule one in advance by calling 800-DEWA (3392).

Tips and Tricks for Obtaining DEWA Approvals Quickly

If you are planning to set up a business in Dubai, you will need to obtain approvals from the Dubai Electricity and Water Authority (DEWA). DEWA is responsible for providing and regulating electricity and water supplies in Dubai.

Applying for DEWA approval can be a lengthy and complicated process. However, there are some tips and tricks that you can follow to help ensure that your application is approved quickly.

Here are some tips for obtaining DEWA approval quickly:

  1. Make sure that you have all the required documents before submitting your application. Incomplete applications will take longer to process.
  2. Application fees must be paid in full before your application can be processed. Be sure to include the correct fee amount when submitting your application.
  3. Include a detailed project description with your application. This will help the review process go more smoothly.
  4. Submit your application online through the DEWA website. This is the quickest way to get your application processed.
  5. Follow up with DEWA after you have submitted your application. This will ensure that your application is being processed and will help avoid any delays.

Frequently Asked Questions (FAQ

 

How long does it take to obtain DEWA approval?

The time it takes to obtain DEWA approval can vary depending on the type of project and the information required. However, our team of experts has streamlined the process and is experienced in obtaining approvals quickly and efficiently.

What is required for DEWA approval?

DEWA approval is required for any project that involves electrical or water connections. This includes new construction, renovations, and even some small projects such as adding a new air conditioner. To obtain DEWA approval, you will need to submit a completed application form along with any supporting documentation. Our team can assist you with ensuring that your application is complete and accurate.

How much does DEWA approval cost?

There is no set fee for DEWA approval, as the cost will vary depending on the size and scope of your project. However, our team can help you estimate the cost of obtaining DEWA approval so that you can budget accordingly.

What are the consequences of not having DEWA approval?

If you proceed with a project without first obtaining DEWA approval, you risk being fined or having your work shut down. Additionally, if there are any issues with your electrical or water connections, you will be responsible for resolving them at your own expense. Obtaining DEWA approval may take some time and effort, but it is worth it to avoid any potential problems down the road.

Conclusion

As you can see, there’s a lot that goes into obtaining DEWA approval for any project. However, with the right knowledge and resources, it is possible to secure all the required approvals in as little time as possible. By following our step-by-step process outlined in this article and applying some of these tips and tricks along the way, obtaining DEWA approval should be much easier for you from here on out. Good luck!

Leave A Comment

No products in the cart.